Skip to content
HMT Hindustan Machine Tools
Modernizing an existing manufacturing plant

Brownfield projects

Modernizing existing manufacturing facilities.

Everything required to upgrade, relocate, optimize or expand factories already in production — without treating shutdown as an afterthought.

Equipment being positioned inside an operating plant

Why this is not a haulage job

A running plant is the constraint. The machine move is the method.

HMT is an industrial engineering and project execution company. Relocation sits inside modernization — alongside retrofit, PLC upgrade and expansion — so shutdown is designed, not discovered on the hook.

  • Shutdown windows are written into the method statement.
  • The crew that surveyed the line is the crew that restarts it.
  • International movement includes packaging, customs and recommissioning.

Relocation sequence

How a machine leaves one floor and starts on another.

Surveying a live production line

01

Survey the live line

Assets, utilities, access and the shifts that cannot stop are mapped before a crate is designed.

Machine prepared and packed for relocation

02

Disconnect and pack

Export-grade packaging, corrosion control and lifting frames written for the machine, not a generic box.

Heavy equipment in transit

03

Move and clear

Inland haul, ports and customs sequenced to the installation window — including overseas transfers.

Machine alignment and restart

04

Set and restart

Alignment, PLC, trial production and the same engineers through handover.

Emergency plant relocation work

When the date has already closed

Emergency relocation is still an engineering job.

If a line has to move inside a window that is already gone, the work is faster — not looser. Survey, lift plan, packaging and restart stay on one desk.

  • Flagged as emergency at the project desk
  • Brownfield scope, compressed sequence
  • Same engineers from disconnect to trial

Brownfield services

Upgrade, relocate, optimize, expand.

Seven workstreams for plants that are already running. Relocation sits inside engineering — it is not a separate haulage business.

Factory Expansion & Modernization

  • Brownfield Expansion Projects
  • Existing Plant Modification
  • Capacity Enhancement
  • Line Balancing

Machine Relocation

  • Factory Relocation
  • Machine Relocation
  • Internal Machine Shifting
  • Plant Transfer
  • Heavy Equipment Movement

International Machine Movement

  • Export Packing
  • Import Handling
  • International Machine Relocation
  • Customs Clearance
  • Port Inspection
  • Overseas Logistics Coordination

Machine Upgrades

  • Machine Retrofitting
  • PLC Upgradation
  • Control System Modernization
  • Electrical Upgrades
  • Automation Retrofit

Manufacturing Optimization

  • Lean Manufacturing
  • Process Improvement
  • Productivity Enhancement
  • Plant Optimization

Engineering Support

  • OEM Coordination
  • Spare Parts Procurement
  • Pre-Owned Machine Procurement
  • Technical Support
  • Preventive Planning

Packaging & Logistics

  • Machine Packaging
  • Export Packaging
  • Industrial Packing
  • Wooden Crating
  • Preservation & Vacuum Packing

Open a service

Every Brownfield service, in full.

Site visit planning for a brownfield project

Next step

Walk the live plant before anyone books a truck.

Request a site visit, or flag an emergency relocation if the shutdown window is already closed.