Survey the live line
Assets, utilities, access and the shifts that cannot stop are mapped before a crate is designed.

Brownfield projects
Everything required to upgrade, relocate, optimize or expand factories already in production — without treating shutdown as an afterthought.

Why this is not a haulage job
HMT is an industrial engineering and project execution company. Relocation sits inside modernization — alongside retrofit, PLC upgrade and expansion — so shutdown is designed, not discovered on the hook.
Relocation sequence

01
Assets, utilities, access and the shifts that cannot stop are mapped before a crate is designed.

02
Export-grade packaging, corrosion control and lifting frames written for the machine, not a generic box.

03
Inland haul, ports and customs sequenced to the installation window — including overseas transfers.

04
Alignment, PLC, trial production and the same engineers through handover.

When the date has already closed
If a line has to move inside a window that is already gone, the work is faster — not looser. Survey, lift plan, packaging and restart stay on one desk.
Brownfield services
Seven workstreams for plants that are already running. Relocation sits inside engineering — it is not a separate haulage business.
Open a service

Next step
Request a site visit, or flag an emergency relocation if the shutdown window is already closed.