Gate 01
Site Survey
Land, utilities, existing assets and constraints measured before a line is drawn.
Then → Engineering & Planning
01
Execution
Site survey through handover. The same team carries the sequence, so a decision made at survey is still true when the line is on trial.
Integrated execution
From Enquiry to Commissioning & Final Handover
Hover or tap any step
Phase 1
Discover & Define
Project type decision
Phase 2
Prepare & Execute
Phase 3
Commission & Deliver
Gate 01
Land, utilities, existing assets and constraints measured before a line is drawn.
Then → Engineering & Planning
01Gate 02
Layouts, load studies, timelines and method statements locked with stakeholders.
Then → Procurement
02Gate 03
OEM equipment, long-lead items and approved vendors brought under one schedule.
Then → Manufacturing & Fabrication
03Gate 04
Structures, skids and custom assemblies built to the approved drawings.
Then → Logistics & Packaging
04Gate 05
Export-grade packing, lifting plans and route surveys for heavy machines.
Then → Installation & Erection
05Gate 06
Cranes, alignment, grouting and mechanical completion on the plant floor.
Then → Automation & Commissioning
06Gate 07
PLC, drives, instrumentation and interlocks proven against the control narrative.
Then → Trial Production
07Gate 08
Supervised runs until rate, quality and safety gates are met.
Then → Handover & Support
08Gate 09
Documentation, training and a team that stays through ramp-up.
Then the plant is yours.
09
Next step
We will tell you which gate you are actually in — and which date that implies.