Greenfield projects

From bare land to production start-up.

Everything required to build and commission a completely new manufacturing facility — engineering, civil works, mechanical installation, machine setup, automation and production readiness.

Engineers reviewing greenfield project drawings

The engagement

A plant is not a set of packages. It is a date the line has to run.

Greenfield work fails when civil, machines and controls are bought as separate jobs. HMT holds them as one programme, from the first survey to trial production.

  • Land, utilities and building constraints measured before drawings lock.
  • OEM equipment and long-lead items procured against the construction sequence.
  • Automation and handover stay with the engineers who set the machines.

Three phases

What a greenfield project actually contains.

Civil and foundation works for a new plant

01

Land & civil

Survey, infrastructure, PEB buildings, epoxy floors and the utilities a hall needs before a machine arrives.

Machinery installation in a new industrial hall

02

Plant & machinery

Procurement, heavy engineering, reactor and boiler erection, EOT cranes and OEM coordination on one schedule.

Commissioning and trial production

03

Commissioning

PLC integration, automation, trial production and technical support through the first stable runs.

Industrial hall prepared for crane and machine installation

The hall

Cranes, floors and bays sized for the machines that will live there.

PEB buildings and EOT cranes are not a civil afterthought. Span, hook height and floor loading are set with the equipment list, so the hall can lift on the day the machines arrive.

  • EOT crane installation
  • Epoxy and load-rated floors
  • MEP coordinated to the machine layout

Greenfield services

Grouped by the work, not dumped in one list.

Seven workstreams from feasibility to the first stable production run. One team holds the interfaces between them.

Engineering & Project Development

  • Project Planning & Feasibility
  • Engineering Procurement & Construction (EPC)
  • Turnkey Industrial Projects
  • Industrial Infrastructure Development

Civil & Structural

  • PEB Buildings
  • Industrial Infrastructure
  • Factory Layout Planning
  • MEP Engineering Services
  • Utility Planning

Mechanical Installation

  • Heavy Engineering Works
  • Reactor & Boiler Erection
  • EOT Crane Supply & Installation
  • Structural Fabrication & Welding

Machine & Production Setup

  • New Machine Procurement
  • International Machine Import
  • Customs Clearance
  • Machine Transportation
  • Machine Installation
  • Machine Commissioning
  • Production Line Integration

Automation & Controls

  • Industrial Automation
  • PLC Programming & Integration
  • Process Automation
  • Smart Factory Solutions

Flooring & Finishing

  • Industrial Epoxy Flooring
  • Safety Marking
  • Production Area Preparation

Production Readiness

  • Trial Production Support
  • Production Line Validation
  • OEM Coordination
  • Technical Documentation
  • Operator Training

Open a service

Every Greenfield service, in full.

Industrial project ready for kickoff

Next step

Start a greenfield brief.

Land, product and the date the first good parts have to ship. We will tell you what has to be true before a line is drawn.